Explanation
The critical path in a PERT/CPM diagram is identified by linking events with the minimum slack time, as these activities directly affect the project duration.
More Production Technology MCQs
Practice related questions from the same subject.
- 1.What is the method called that is used to set and manage the priority levels of different tasks within a project?
- 2.What does PERT represent in project management?
- 3.Which of the following are part of the CPM family?
- 4.PERT analysis relies on which of the following time estimates?
- 5.In a PERT/CPM diagram, what does the symbol 'O' signify?
- 6.What is the fundamental assumption made in the PERT methodology?
- 7.Which of the following statements is essential when creating a PERT chart?
- 8.What does the term 'pessimistic time' refer to in project scheduling?
More in Mechanical Engineering Mcqs
- Compressors, Gas Turbines and Jet Engines
- Engineering Materials
- Engineering Mechanics
- Fluid Mechanics
- Heat Transfer
- Hydraulic Machines
- I.C. Engines
- Machine Design
- Nuclear Power Plants
- Refrigeration and Air Conditioning
- Steam Boilers, Engines, Nozzles and Turbines
- Strength of Materials
- Theory of Machines
- Thermodynamics
- Workshop Technology