Explanation
Critical ratio scheduling is a technique used to determine and maintain the priority order of various tasks in a project. Other options like event sequence scheduling, time slot allocation, and brief interval scheduling refer to different scheduling approaches.
More Production Technology MCQs
Practice related questions from the same subject.
- 1.What does PERT represent in project management?
- 2.Which of the following are part of the CPM family?
- 3.PERT analysis relies on which of the following time estimates?
- 4.In a PERT/CPM diagram, what does the symbol 'O' signify?
- 5.In a PERT/CPM chart, the critical path is determined by connecting events that have which characteristic?
- 6.What is the fundamental assumption made in the PERT methodology?
- 7.Which of the following statements is essential when creating a PERT chart?
- 8.What does the term 'pessimistic time' refer to in project scheduling?
More in Mechanical Engineering Mcqs
- Compressors, Gas Turbines and Jet Engines
- Engineering Materials
- Engineering Mechanics
- Fluid Mechanics
- Heat Transfer
- Hydraulic Machines
- I.C. Engines
- Machine Design
- Nuclear Power Plants
- Refrigeration and Air Conditioning
- Steam Boilers, Engines, Nozzles and Turbines
- Strength of Materials
- Theory of Machines
- Thermodynamics
- Workshop Technology