Explanation
The dipper shovel has the shortest cycle time compared to draglines, hoes, and clamshells, allowing it to perform earthmoving tasks more quickly.
More Construction Planning and Management MCQs
Practice related questions from the same subject.
- 1.What is the minimum required width for fire escape stairways?
- 2.Which of the following statements is incorrect?
- 3.Identify the statement that is false regarding start float and finish float.
- 4.Identify the statement that is incorrect:
- 5.For which type of projects is the PERT network analysis method primarily designed?
- 6.Which of the following statements is accurate regarding CPM network diagrams?
- 7.In PERT analysis, which probability distribution is used to estimate the duration of activities and their likelihood?
- 8.The earliest completion time of an activity is always ____________ compared to the earliest event time of its succeeding node?
More in Civil Engineering Mcqs
- Airport Engineering
- Applied Mechanics and Graphic Statics
- Building Materials and Construction
- Design of Concrete Structures
- Design of Masonry Structures
- Design of Steel Structures
- Dock and Harbor Engineering
- Elements of Remote Sensing
- Engineering Economy
- Environmental Engineering
- Estimating and Costing
- Fluid Mechanics
- Highway Engineering
- Hydraulics and Fluid Mechanics
- Irrigation, Water Resources Engineering and Hydrology
- RCC Structures Design
- Railway Engineering
- Soil Mechanics and Foundation Engineering
- Strength of Materials
- Structural Analysis
- Structural Design Specifications
- Surveying
- Theory of Structures
- Tunnel Engineering
- Waste Water Engineering
- Water Supply Engineering